Map
Index
Random
Help
th

Quote: the program designer must impose performance constraints on the analyst; requires a preliminary design before analysis begins

topics > all references > references p-r > QuoteRef: roycWW8_1970 , p. 331



Topic:
management of large software projects
Group:
requirement specification
Topic:
team programming

Quotation Skeleton

Figure 5. Step 1: Insure that a preliminary … [p. 331] As the analysis proceeds in the succeeding … such a way that he senses the consequences. … it must be simultaneously snatched from his analyst …   Google-1   Google-2

Copyright clearance needed for quotation.


Related Topics up

Topic: management of large software projects (63 items)
Group: requirement specification   (11 topics, 306 quotes)
Topic: team programming (7 items)

Copyright © 2002-2008 by C. Bradford Barber. All rights reserved.
Thesa is a trademark of C. Bradford Barber.